1) Fit braided brake lines and new Dot 4
2) Fit FMIC and fabricate Aluminium I/C pipework if I can scrounge an AC TIG set.
3) New Clutch and Alloy Flywheel
5) 5th Gear Syncro
6) Fit the Propane Injection
7) Put the battery in the boot
8) Change from MAF to Air Density
I'll maybe get the Clutch, Flywheel and Synchro done over Christmas.