This potentielly leaves us 8 weeks to get everything ready so yesterday I sat down to work out our plan of action. Not good

1 weekend we are at santa pod
1 weekend we are at Donnington
2 weekends Alan is at work
This leaves us 4 weekends to get the following done.
1. Relocate the seventh injector for better fuel distribution
2. Install the MF2 controller
3. Have the MF2 set up and mapped
4. Fit new magnecor leads
5. Oil and filter change
6. Re-wire oil pressure and temperature gauges
7. Have wheels balanced and tracking checked
8. Sort out front bumper/splitter (That won't scrape)
9. Improve the balance of the car
10. Check / change brake pads
I'm sure there are a few more things that will need to be done